January 21, 1960.
The City Council met in called session on the above date with Mayor Evans pre -
siding and the following aldermen present: Virgil Dickerson, Chas. Riggins, Walter
Brandon, Albert Graves, Dean Murray and Scott D. Reed.
Water Supt. Gann and City Atty. Chandler were present for the meeting.
Mayor Evans reported the purpose of the meeting was to open and consider bids
for the Water Improvement Project.
ill
The following bids were received ::
Elmfourth Construction Co.
Contract A - -- -- -------- --- ---- --$81,200:00
Contract B (cast iron pipe) -------------------- - - - - -- 68,670.00
Contract C---=--------- ------- -- -- ----- ----- -- - - - - --- 30,000.00
If awarded contracts A, B & C. deduct--------------- - - - - -- 41000.00
Wayne W: Smith Inc.
Contract A----=- --- - - ---- ---- ------- --- ----- 084,414-00
Contract B (cast iron pipe) -------------------- - - - - -- 52,295.00
Stead Construction Co.
Contract A ------------------------------------------- $85,880.00
Contract B (cast iron pipe)-------------------- - - - - -- 49,580.00
Clyde Smith Co.
Contract A ------------------------------------------- $90,178.00
M. B. McKee Engineering Equipment Co.
Contract A ------------------------------------------- $84,060.00
Contract B (cast iron pipe) -------------------- - - - - -- 53,412.00
Contract B (cement pipe ) ----------------------- - - - - -- 47,189.00
Contract C--------------- -- -- ---- --- ------- ------- - -- 35,650.00
Hicks Construction Co.
Contract A------------- ------ ----- ---- -------- - - - - -- - 88,000.00
Contract B (cast iron pipe)-------------------- - - - - -- 48,228.00
S. M. Farquhar Co.
Contract A ------------------------------------------- $82,538.00
Boughton-Ericson
Contract A ------- - ----------------------------------- $95,838.00
Gorbett "Bros. Steel Co.
Contract'A ------- - ----------------------------------- $86,247.00
Rhodes Construction Co.
Contract B (cast iron pipe) -------------------------- $48,807.50
C. C. Gunter
Contract B (cement asbestos Pipe) -------------------- $37,174.50
Hamilton Excavation Co.
Contract B (cement asbestos pipe )--------------- - - - - -U 9,911.50
Kemp Construction Co.
Contract B (cast iron Pipe) -------------------------- $57,630.00
Carriker Construction Co.
Contract B (cast iron pipe) -------------------------- $462510-00
Contract B (cement pipe) ----------------------------- 46,510.00
Price Electric Co. -
Contract C -------------- - ---------------------------- $33,721.58
City Electric Co.
Contract C ------------------------------------------- $27,777.00
Good Electric Co.
Contract C ------------------------------------------- $28,950.00
Rowan & Wallace
C"ont"ract C--------------- --- --------------- --- -- - - -- $35,609.00
Layne -Texas Co.
Contract D------------------------ --- --- ------- --- ---40,428.00
J. L. Myers Sons
Contract D ------------------------------------------- $45,516.00
41
Texas Water Wells
Contract D' ---------------------------------------- $39,970.00
It was suggested, and agreed, that these bids be placed in the hands of the
Engineer for further study and the contracts be awarded at a later date.
There being no other business, the Council stood adjourned subject to the
Mayor's call.
ATTEST: Mayor.